Month: July 2018

  • Opening of the fish ramp in Ascó

    , ,

    On friday 15 June 2018 formally took place the opening of the fish ramp built at Ascó’s dam. The works ended by 2017 and is actually fully working, allowing migratory fish crossing up and down Ebre river. It consists of some receivers which register the steps of the fish specimen that have been catched during…

  • Little ones Fest

    , ,

    On Saturday 30th June and Sunday 1st of July took place “Little Ones Fest” at MónNatura Delta. This year LIFE Migratoebre project has been present with the Ebre river migratory fish mock-ups; European sturgeon, European eel, twaite shad and sea lamprey, dissemination materials and the video about Ebre river to explain the project to the…

  • At the 9th rowing descent down Ebre river

    , ,

    On a yearly bases IDECE organizes the rowing descent down Ebre river, and LIFE Migratoebre project has attended again this 9th edition to explain everyone the european sturgeon reintroduction project, the imrpovement of other migratory fish populations and the ecological connection at the lower stretch of Ebre river down to its mouth. More than 130…